PDI has been awarded a contract to purchase and supply an Air Inlet and Exhaust System for a Frame 5 Gas Turbine Generator (GTG) being installed at a Power Station based in South Australia.
The Power Station currently consists of eleven Frame 5 open cycle generating units giving a combined output of 180MW. The Frame 5 GTG will be the twelfth unit, and the scope includes design, manufacture, works inspection and testing and delivery of the air inlet and exhaust systems.
PDI was awarded this contract based on their intimate knowledge and extensive experience with the Frame type GTG units.
![]()

| Location | Iraq |
| Services Provided | Equipment Acquisition |
| Plant Type | Diesel Generating Sets |
| Plant Capacity | 30 MW |
| Equipment | 15 x 2MW CAT 3516 DITA Mobile Power Modules |
| Operational Status | Completed |
In 2003, the Coalition Provisional Authority (“CPA”) was established as a transitional government overseeing reconstruction in post-conflict Iraq.
The CPA was established to focus on helping Iaqis build four foundational pillars for their indepence: Secuirty, Essential Services, Economy and Governance.
As part of the CPA restoration plan, PDI was awarded a contract to supply emergency power in various locations throughout Iraq. The services included in the contract were the sourcing and engineering of fifteen 2 MW CAT 3516 DITA Mobile Power Modules Transformers Cabling Fuel Tanks.